Skip to content

feat: enhance serial monitor functionality with UTF-8 decoding options #37

feat: enhance serial monitor functionality with UTF-8 decoding options

feat: enhance serial monitor functionality with UTF-8 decoding options #37

Re-run triggered August 15, 2025 10:08
Status Failure
Total duration 1m 7s
Artifacts

ci.yaml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.11)
Process completed with exit code 1.
test (3.13)
The operation was canceled.
test (3.13)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed