-
Notifications
You must be signed in to change notification settings - Fork 42
Sprint Backlog Progress Report
Update on the progress on User Stories @ 20.10.2015
US 1 - completed -Link: #66
US 2 - completed -Link: #67
US 3 - completed -Link: #68
US 4 - completed -Link: #69
US 5 - completed -Link: #244
US 6 - completed -Link: #245
US 7 - completed -Link: #246
US 8 - in progress (to be tested) -Link: #247
-Filter is not tested. Work around will be use as long no well tested funktion is provided.
US 9 - in progress (to be tested) -Link: #248
-Movement Authority request to be positioned in the right coordinated system. Testing of Movement Authority correction will be tested by@JakobGärtner. Will be done and tested on the 22nd of october.
US 10 - open -Link: #249
- Level Change change from Level 2 to NTC should work and needs to be tested.(Marielle Petit Doche)
- Train will be supervised in ATB mode in the same pattern as in the beginning in Amsterdam. Can be tested (Jakob Gärtner)
US 11 - open -Link: #250
- Level Change from Level 2 to NTC is implemented and needs to be tested. (Mariellle Petit Doche)
US 12 - open -Link: #251
-RBC message to teminate radio session is implemented (Johannes Kastner) -Termination of Communication is implemented in MoRC (Uwe Steinke)
US 13 - open -Link: #70
-Track Model to simulate the scenario has been started (Jakob Gärtner). -How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner) -RBC Model to simulate the scenario needs to be started. (Johannes Kastner) -Braking Curve Model needs to be tested according to the US (Thorsten Schulz)
US 14 - open -Link: #71
- Track Model to simulate the scenario has been started (Jakob Gärtner). -How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner) -DLR will deliver implementation of the User Story (Marc Behrens) -RBC Model to simulate the scenario needs to be started. (Johannes Kastner) -Mode and Level Management needs to be tested (Marielle Petit Doche) DMI Controller and Management needs to be tested (Baseliyos Jacob) Environment model to brake release needs to be tested (Stefan Karg) Braking Curve Model needs to be tested according to the US (Thorsten Schulz)
US 15 - open -Link: #72
-Track Model to simulate the scenario has been started (Jakob Gärtner). -How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner) -RBC Model to simulate the scenario needs to be tested. (Johannes Kastner) -Mode and Level Management needs to be tested (Marielle Petit Doche) -DMI Controller and Management needs to be tested (Baseliyos Jacob) -Environment model to brake release needs to be tested (Stefan Karg) -Braking Curve Model needs to be tested according to the US (Thorsten Schulz)
US 16 - open -Link: #73
-Track Model to simulate the scenario has been started (Jakob Gärtner). -How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner) -RBC Model to simulate the scenario needs to be tested. (Johannes Kastner) -Mode and Level Management needs to be tested (Marielle Petit Doche) -DMI Controller and Management needs to be tested (Baseliyos Jacob) -Environment model to brake release needs to be tested (Stefan Karg) -Braking Curve Model needs to be tested according to the US (Thorsten Schulz)